Radiology Refurbishments in Melbourne for Operating Clinics
Radiology refurbishments in Melbourne usually happen while the clinic is still booked out with patients. A CT scanner reaches the end of its life, an X-ray room needs upgrading, or a tired waiting area no longer reflects the standard of care, yet referrers still expect results on time.
BuildMarque refurbishes operating imaging clinics in stages, so one room can be stripped and rebuilt while the others keep scanning. We prepare rooms for new equipment, coordinate shielding and services with your consultant and supplier, and protect patients and staff from dust and noise. The aim is a refreshed clinic with as little lost imaging time as possible.
In short: Operating imaging clinics around Melbourne call on BuildMarque, the city-based design-and-construct team, to refurbish rooms and prepare them for replacement equipment. Costs hinge on which rooms are involved, shielding changes, structural or services upgrades and staging. We visit your running clinic for a free on-site consultation, then send a staged, fixed-scope quote and respond quickly.


Trusted Radiology Refurbishment Team in Melbourne
Many Melbourne imaging clinics were fitted out ten or fifteen years ago, when equipment was smaller and patient numbers lower. Replacing a scanner today often means a heavier unit, different power and cooling needs, and new shielding calculations. At the same time, owners cannot afford to close the whole practice, because referrers quickly send patients elsewhere when appointments dry up.
Our refurbishments start with an inspection of the existing rooms, services and shielding, followed by a feasibility review of the incoming equipment’s requirements. We then tailor a staged scope that keeps as many modalities running as possible. Our in-house architects document each room, and our project managers coordinate the radiation consultant, the equipment supplier and our own trades so the old unit comes out, the room is rebuilt and the new unit is installed in one continuous sequence. It is a careful process, but one that protects your referral base. Learn more about our radiology fitout services.
What Your Radiology Refurbishment in Melbourne Can Include
Each refurbishment is shaped by the rooms involved and the clinic’s timetable, and may include:
- Feasibility and site assessment. We check structure, floor loads, ceiling heights, services capacity and access for equipment delivery before design starts.
- Imaging suite design. Our architects plan scan rooms, control rooms, change areas, reporting rooms and reception around modality requirements and patient flow.
- Shielding and approvals. We coordinate the consultant physicist’s shielding assessment, building permits and landlord approvals, and document the shielding as built.


Spaces Designed to Perform
- Specialist services. Dedicated power, data, cooling, ventilation and, where required, chilled water and quench venting are designed with your equipment supplier.
- Structure and equipment support. Floor strengthening, ceiling mounts and support steel are engineered and installed so heavy equipment sits safely and precisely.
- Construction, certification and handover. We build, certify and hand over rooms ready for equipment installation, physicist verification and clinical use.
Compliance, Safety, and Build Quality
Diagnostic imaging facilities carry some of the most demanding requirements of any healthcare fitout. Every radiology fitout must satisfy the National Construction Code, accessibility standards, fire safety requirements and the radiation shielding specified by a qualified consultant, while supporting the practice’s radiation licence under Victorian regulations.
BuildMarque manages compliance as part of the project, not an afterthought. We build shielding exactly to the assessment, photograph it before linings are closed, coordinate structural and services engineers, and hand over the documentation your licence application and future alterations will rely on.


Preparing Rooms for Equipment Replacement
A new scanner or X-ray unit rarely drops neatly into the room that held the old one. We prepare each room so the installation runs smoothly:
- Shielding review. Your radiation consultant reassesses the room for the new unit’s output and workload. We then add or adjust lead lining in walls, doors and viewing windows to match the new assessment. Certification is completed before the room is used.
- Floor and structure. Newer equipment can be heavier or need different fixing points. We check slab capacity and set-out with an engineer and the supplier before work starts. Any strengthening is done before the new unit is delivered.
- Power and cooling. Replacement units may need new circuits, dedicated isolators or extra air-conditioning capacity. We confirm these needs early to avoid delays at commissioning.
- Access route. We plan how the old unit leaves and the new one arrives, including door widths, lifts, corridors and any temporary removal of walls or windows.
How We Handle a Radiology Refurbishment in Melbourne
On Melbourne refurbishments we agree the order of works with your practice manager, room by room, before anything is demolished. Each stage is fully sealed off, and handover of one room happens before the next closes. The project then runs through four clear steps:
- 1. Inspect. We assess structure, services, access and the modalities you plan to install.
- 2. Explain. We walk you through layout options, shielding, approvals and likely costs in plain language.
- 3. Scope. You receive a fixed scope, budget and program coordinated with your physicist and equipment supplier.
- 4. Complete. We build, certify and hand over imaging rooms ready for equipment installation and verification.


Keeping Other Modalities Running During Works
Keeping other rooms imaging while one is rebuilt takes careful planning. These are the measures we use most often:
- Sealed work zones. Hoarding, negative air and sealed doors keep dust and debris inside the room being refurbished and away from patients, staff and sensitive equipment. Air quality is monitored throughout each stage.
- Noise scheduling. Demolition, drilling and other loud tasks are timed for early mornings, evenings or weekends, outside the busiest booking periods. Patients are told in advance about any changes to their appointment.
- Separate access. Trades use a different entry or a set time window, so they do not pass through waiting rooms or cross patient corridors during clinic hours. Protective coverings are laid along every route used by trades.
- Services continuity. Electrical, data and mechanical changes are planned so live rooms keep power, network and cooling, with any shutdowns agreed in advance and kept short. The reception desk is warned before every planned shutdown, so bookings can be adjusted.
How Much Does a Radiology Refurbishment Cost in Melbourne?
Our quote sets out each stage separately so you can plan around it. Radiology refurbishments are priced on the specific rooms and staging involved. The main cost drivers are:
- Number of rooms: each modality room has its own shielding, services and finishes.
- Equipment changes: heavier or larger units may need structural or power upgrades.
- Staging: more stages and after-hours work extend the programme.
- Existing conditions: asbestos, outdated switchboards or hidden services add work.
Book a free on-site consultation for a fixed-scope quote, or call 1300 601 871.


Refurbishing Imaging Clinics Across Melbourne
We refurbish imaging clinics across Melbourne, from CBD and inner-suburban practices to larger centres in the northern, eastern and south-eastern suburbs. Our office at L19, 180 Lonsdale Street lets our project managers attend sites quickly when a stage is being handed over. We also work on pathology and diagnostic spaces, including Australian Clinical Labs sites in Brunswick and Frankston. If you are planning a larger change or a new practice, these related pages may help:
Frequently Asked Questions About Radiology Refurbishments in Melbourne
What do radiology refurbishments in Melbourne involve?
Radiology refurbishments in Melbourne often prepare rooms for equipment replacement while keeping other modalities running. We upgrade finishes, services and shielding as needed and coordinate closely with suppliers, so the new equipment can be installed on time.
How do you prepare rooms for equipment replacement?
We confirm the new equipment’s requirements with the supplier, then adjust services, ceiling mounts, power and data, and shielding to suit. Removal of old equipment and delivery of the new unit are scheduled into the refurbishment program.
Can other modalities keep running during works?
Yes. We isolate the work area, protect patient routes and schedule noisy tasks after hours. This lets Melbourne imaging clinics continue X-ray, ultrasound or CT lists while one room is being refurbished, so referrals keep flowing during the upgrade.
Does replacement equipment need a new shielding assessment?
Often it does, especially if workload or equipment output changes. We coordinate with your physicist early, build any additional shielding the updated assessment requires and document it for your licence records before the new unit is used.
How long does a radiology refurbishment take?
It depends on scope, approvals and equipment lead times. We align the refurbishment program with the supplier’s delivery and installation dates, so each room is out of service for the shortest practical time and staff rosters can be planned.
Do you coordinate with Melbourne building management?
Yes. We arrange access, loading docks, lift bookings and approvals, which is important when removing old equipment and bringing new units into a shared Melbourne building. Clear planning avoids last-minute delays on removal or delivery days.
Can refurbishments include patient areas?
Yes. We can refresh reception, waiting rooms and change rooms alongside the clinical works, giving patients a noticeably better experience while the equipment upgrade is completed and helping the clinic present a consistent, modern image.
How do I get a quote for a radiology refurbishment?
Let us know which rooms and equipment are changing, either on 1300 601 871 or through our refurbishment enquiry. Following a free on-site consultation in Melbourne, we quote a program aligned with the supplier’s delivery date that keeps the clinic operating.





